Horiba establishes state-of-the-art US$12m battery test facility

Horiba is building a new US$12m test facility for batteries and fuel cells at the Horiba Biwako E-Harbor site in Otsu City, Shiga Prefecture, which will enable it to better respond to future test requirements.
The facility includes laboratories dedicated to battery cell analysis, modules, and packs equipped with the latest test equipment including test systems for charge-discharge cycle evaluation and thermal management climatic durability analysis.
By establishing the laboratories within the existing E-Lab at Horiba Biwako E-Harbor, engineers will be able to work with others from the powertrain department where conventional engines and drivelines are developed, on the evaluation of batteries and battery management systems.
广告 编辑推荐
最新资讯
-
下载|泰克汽车电子测试白皮书
2025-06-05 17:53
-
辅助驾驶强标立项制定!华为、东风等起草
2025-06-05 17:53
-
标准立项 | 《乘用车避障紧急变线无人试验
2025-06-05 16:55
-
Safety Pro 汽车功能安全分析
2025-06-05 16:53
-
3大核心优势:imc防侧滚系统,让列车行驶更
2025-06-05 16:52





广告
























































